New project — not saved

Project design path

  1. 1Define basis
  2. 2Build flowsheet
  3. 3Resolve checks
  4. 4Prepare deliverables

Next required action

Record the source, flow basis and project constraints

Mini Map

Start a treatment design

Describe the source, scale, influent, and constraints to compare defensible treatment concepts, or start from a template or blank train.

Hydraulic profile — site levels and energy balance

Build a required water-level envelope from the downstream boundary through every main-path unit. Supply total reach losses or calculate full-pipe connections with explicit remaining unit/control losses for each flow case. Existing individual weir/channel losses are not automatically treated as total plant losses.

Required energy envelope for the drawn main water path at each specified flow case. Supplied total losses must include units, pipes, fittings, controls and operating condition. Velocity head is alpha*V²/(2g). Explicitly attached reservoir pump studies supply their reach head and complete losses. This is not a backwater, weir-submergence, surge, whole-network pump/control or recycle/sludge-network solver. Freeboard applies only at the listed open-water checkpoints; intermediate high points and controls require separate checks. Extra inlet energy needs an explicit dissipation/control design.